
Get The Most Updated C-TS422-2504 Dumps To SAP Certified Associate Certification
SAP Certified C-TS422-2504 Dumps Questions Valid C-TS422-2504 Materials
NEW QUESTION # 34
Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question.
- A. It can be accessed by using SAP For Me.
- B. Customers can grant access to the dashboard to partners.
- C. Customers can use the dashboard in the dev test production tenants.
- D. It can be used in all SAP S/4HANA Cloud editions.
Answer: A,B
NEW QUESTION # 35
You are trying to create a production order and no valid production version can be selected. What could be the reasons?
Note: There are 2 correct answers to this question.
- A. The basic start date is NOT within the validity period of the production version.
- B. No production lines are assigned to the production versions.
- C. No bills of material (BOMs) are assigned to the production versions.
- D. The order lot size is NOT within the validity range of a production version.
Answer: A,D
NEW QUESTION # 36
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
- A. A sales order is delivered.
- B. MRP creates a planned order.
- C. MRP creates a dependent requirement.
- D. A sales order is created.
Answer: D
NEW QUESTION # 37
What does the material type influence?
Note: There are 2 correct answers to this question.
- A. Which material master screens appear in which sequence
- B. Which plantspecific plantindependent statuses are allowed
- C. Which document types class categories are allowed
- D. Whether the material is produced inhouse procured externally or both
Answer: A,C
NEW QUESTION # 38
For a production version to be valid consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The lot size range must be within the lot size range of the assigned routing.
- B. The consistency check must be performed.
- C. The assigned routing bill of material (BOM) must have the same validity period.
- D. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
- E. The assigned routing bill of material (BOM) must be valid in the entire validity period.
Answer: A,D,E
NEW QUESTION # 39
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Routings
- B. Production order
- C. Work center
- D. Bill of material
Answer: A,D
NEW QUESTION # 40
In SAP documentation for MRP in Advanced Planning, you read that the MRP creates new planned orders through infinite scheduling. What does this mean for the capacity requirements of the new planned order?
- A. MRP creates the capacity requirements on resources at the earliest possible production time.
- B. MRP creates the capacity requirements without considering existing load on the resources.
- C. MRP automatically assigns the capacity requirements after the last scheduled operation for each resource.
- D. MRP automatically assigns the capacity requirements to resources with the earliest available capacity.
Answer: B
NEW QUESTION # 41
Which settings can you make in a production scheduling profile?
Note: There are 3 correct answers to this question.
- A. Automatic release on order creation
- B. Automatic goods issue on confirmation
- C. Automatic print on order creation
- D. Default order types
- E. Automatic goods receipt on confirmation
Answer: A,D,E
NEW QUESTION # 42
Where does the system check master data selection settings during the creation of planned orders production orders? Note: There are 3 correct answers to this question.
- A. In the production version
- B. In the MRP controller
- C. In the routing
- D. In the bill of material (BOM)
- E. In the work centers
Answer: B,C,D
NEW QUESTION # 43
Which order type is used for repetitive manufacturing?
- A. Production order
- B. Planned order
- C. Process order
- D. Kanban order
Answer: B
NEW QUESTION # 44
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.
- A. The production quantity must lie within the lot-size range of the production version.
- B. The basic end date of the order must lie within the validity period of the production version.
- C. The production quantity must only lie within the lot-size range of the routing in the production version.
- D. The basic start date of the order must lie within the validity period of the production version.
- E. The production version must NOT be deleted.
Answer: A,C,D
NEW QUESTION # 45
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender Note: There are 2 correct answers to this question.
- A. Inhouse production time
- B. Operation duration
- C. Planned delivery time
- D. Total replenishment lead time
Answer: A,C
NEW QUESTION # 46
Your quality department detects a deviation in a raw material batch. Unfortunately this batch has already been used in production. How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.
- A. Use the batch whereused list.
- B. Use batch determination.
- C. Use batch derivation.
- D. Use the Batch Information Cockpit.
Answer: A,D
NEW QUESTION # 47
Your project team decides to use a maketoorder planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision? Note: There are 3 correct answers to this question.
- A. Storage location MRP areas are required for salesorderspecific stock.
- B. Production orders are created with sales order reference.
- C. Net requirements calculation is carried out for every sales order individually.
- D. Both the reduction of maketoorder stock requirements occur on delivery.
- E. Sales orders have to be ATPconfirmed (availabletopromise) to be saved.
Answer: B,C,E
NEW QUESTION # 48
What are the selection criteria of a bill of material (BOM) alternative?
Note: There are 2 correct answers to this question.
- A. Change number
- B. Date
- C. Lot size
- D. Material BOM usage
Answer: B,C
NEW QUESTION # 49
What determines whether the planned independent requirements in dem management are consumed by other requirements? Note: There are 2 correct answers to this question.
- A. Planning strategy
- B. Requirements type
- C. Order type
- D. Requirements profile
Answer: A,B
NEW QUESTION # 50
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
Note: There are 2 correct answers to this question.
- A. Production order
- B. Planned order
- C. Scheduling agreement schedule line
- D. Purchase order
Answer: B,C
NEW QUESTION # 51
Why do you use Engineering Change Management? Note: There are 2 correct answers to this question.
- A. To enable integration into a sales order
- B. To monitor document object changes
- C. To monitor document table changes
- D. To save multiple changes for an object
Answer: B,D
NEW QUESTION # 52
Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.
- A. It can be accessed by using SAP For Me.
- B. Customers can grant access to the dashboard to partners.
- C. Customers can use the dashboard in the dev, test, and production tenants.
- D. It can be used in all SAP S/4HANA Cloud editions.
Answer: A,B
NEW QUESTION # 53
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.
- A. The same account category is used.
- B. The same batch management level is used.
- C. The quantity and value updates are the same.
- D. The same base unit of measure is used.
Answer: C,D
NEW QUESTION # 54
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
- A. An operation is scheduled as close as possible to the desired date.
- B. To create a slot, neighbouring operations are moved in both planning directions.
- C. Sequencing on multi-activity resources is automatically updated during planning.
- D. Operations on multi-resources are planned finitely in a sequence.
Answer: A
NEW QUESTION # 55
What are the key features of using a low level code? Note: There are 2 correct answers to this question.
- A. To determine the sequence in which materials are planned in MRP
- B. To determine how costs are rolled up by product costing
- C. To determine the use of subitems inside material BOM (bill of material)
- D. To determine the priority of alternative components inside ATP
Answer: A,B
NEW QUESTION # 56
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.
- A. 100% check
- B. First in first out (FIFO)
- C. Simultaneous
- D. Manual maintenance
Answer: A,D
NEW QUESTION # 57
How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question.
- A. They are created with exact times in Advanced Planning.
- B. They are created together with the independent requirement for the finished product.
- C. They are only created for multilevel bill of material (BOM) structures.
- D. They are created on assembly level during the planning run.
Answer: A,D
NEW QUESTION # 58
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. BOM header status
- B. Lot size
- C. BOM component status
- D. Manufacturing date
Answer: B,D
NEW QUESTION # 59
......
C-TS422-2504 Premium PDF & Test Engine Files with 89 Questions & Answers: https://www.free4torrent.com/C-TS422-2504-braindumps-torrent.html
Current C-TS422-2504 Exam Dumps [2026] Complete SAP Exam Smoothly: https://drive.google.com/open?id=1FapuaFKHHehBFDsQBuni7WWeHdetBO4R