The Aruba Certified Design Expert certification is recognized globally and is highly valued by employers, as it demonstrates that you have the ability to design and implement scalable, secure, and high-performance wireless networks. The HPE6-A80 exam focuses on advanced wireless design principles, including site surveys, capacity planning, and network optimization, as well as advanced security and troubleshooting techniques.
NEW QUESTION # 27
Refer to the exhibit.
Exhibit: A49.01114316-102
The architect has determined that this building requires two 10GPE links to the data center.
What is the correct transceiver type for the links?
- A. SFP+ LR
- B. SFP+ SR
- C. 3FP+ LRM with mode conditioning
- D. SFP+ LRM
Answer: D
NEW QUESTION # 28
Refer to the exhibit.
A hospital needs an upgrade to 802.1tax for its wireless network. The wireless network supports:
* wireless medical devices
* medical staff voice communicators
* laptops in nurse stations
* medical staff tablets
* visitor and patient personal devices.
All of these devices support both the 2 4GHz and 5GH2 band. Assuming about a max throughput on50 Mbps per AP; the hospital would like. The architect has used VisualRF to plan the AP placement on one of the floors, which the hospital expects will need to suppod about 800 win to deploy APS in stairwells between floors.
How well does the plan meet the requirements?
- A. The current AP placement meets coverage requirements, but does not meet capacity requirements.
- B. The current AP placement meets the customer requirements in terms of coverage and capacity.
- C. The current AP placement fails to provide adequate signal for the voice communicators in several areas
- D. The current AP placement fails to account for the lead-lined wails that are common in patient and exam rooms.
Answer: D
NEW QUESTION # 29
For which scenario do Aruba CX 6300M Series switches meet the needs for an upgrade of the wired access layer while the Aruba CX 630QF Series switches do not?
- A. The customer wants to utilize the Aruba AP-515 support for 002 3bz connectivity.
- B. The Aruba CX6300M supports 10GBase-T connectivity with AP-515.
- C. The customer wants to utilize LACP on AP515 in VSF switch configuration.
- D. The Aruba CX 630DM support up to 75W PoE+ per port
Answer: D
NEW QUESTION # 30
Refer to the exhibit.
A customer needs a wireless network upgrade and has these requirements.
- Support any applications used on a wired connection
- Support up to 2500 wireless clients
- Support seamless roaming from floor to floor and building to building
- Continue to function seamlessly if one controller fails
The architect has designed the logical infrastructure for the network as shown in the exhibit Which change should the architect make to belter meet customer requirements and besl practices?
- A. Combine the /25 subnets for wireless users into a /20 subnet
- B. Combine me /25 subnets for wireless and wired users into a /16 subnet.
- C. Place each controller in a different VLAN and subnet.
- D. Install additional Mobility Controller.
Answer: D
NEW QUESTION # 31
Refer to the exhibit.

A customer needs a new branch office solution that:
provides 802.11ac wireless access to local resources and the local Internet connection connects wired and wireless users to resources at the main office in a secure manner The office has 200 users, who will the up to two wireless devices at the same time. The architect has determined that the office requires 10-13 AP-
515s. The customer wants to support a total bandwidth from an or me APS or about 2 cops.
The entire site is currently wired for CAT5e from a single wiring closet, which contains two access switches, a core switch, and the Internet cable modem, which has 10/10O/1OQO Mbps BASE-T ports. The wired networK will handle abouti Gbps of traffic. The switches do not support P0E/P0E+.
About 75 percent of all traffic is destined to the main office
The architect has looked up these specs for 7000 series controllers.
Which MC will meet the needs in the most cost-effective manner?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: C
NEW QUESTION # 32
A mall requires a wireless network upgrade to 802 -Max The company that owns the mall wants to provide the APs for the entire mall. However, several of the larger national chain retailers with spaces in the mall want to offer wireless services with their own SSIDs.
These individual retailers also have their own wireless guest services and wireless client devices They have their own corporate infrastructure and want to handle all of this wireless traffic on their own, including terminating the traffic on their own controllers. The mall requires redundancy for its services, out the retailers do not.
Which plan for mobility controllers (MCs) and mobility master (MW) meets the needs of this scenario?
- A. two MCs for the mall company and for all of the retailers, both controlled by the same pair of MMs
- B. two MCs for the mall company and one MC for each retailer with its own SSIDs, all controlled by the same pair of MMs
- C. two MCs for the mail company controlled by a pair of MMS; one standalone MC for each retailer with its own SSIDS
- D. a pair of MMs for the mall company, but not MCs: MMs control one MC for each retailer with its own SSIDs
Answer: D
NEW QUESTION # 33
A company already has an Aruba wireless network The network currently consists of:
* oneMM-HW-1k
* two 7210 MCs in the network core
* two 721GMCsintheDMZ
* 200 AP-515S in Building 1 and Building 5
100 AP-515S each In Building 2r Building 3, and Building 4
The customer now wants to assess if it needs local Mobility controllers (MC) for any buildings:
- Building 1 is the main office building for the campus. It supports the highest number of APs. It connects to the network core without an aggregation layer.
* Building 2 is further away from the Building i. and no roaming is provided between it and the other buildings its access layer connects to the network cone with a pair of Aruba CX 6300M aggregation switches.
* Building 3 is further away from the other buildings, it connects to the network core without an aggregation layer.
The Guest SSID traffic should be tunnelled to the DMZ controllers
' Building 4 has its own local datacenter and Internet connection. The company would like it to be able to operate completely autonomously if its aggregation layer loses connectivity with the core.
* Building 5 is further away from the other buildings, it connects to the network core without an aggregation layer.
This building has been assigned to a partner that would like to manage a dedicated SS1D using the shared AP infrastructure.
In which two buildings should the network architect plan local mobility controllers (MCs)? (Select two)
- A. Building 1
- B. Building 5
- C. Building 4
- D. Building 2
- E. Building 3
Answer: A,E
NEW QUESTION # 34
Refer to the exhibit.
The exhibit shows the design for an existing network. The customer intends to replace the current Core switches with two Aruba 8400 switches.
What are two points that the architect should ensure that the customer understands? (Select two.)
- A. The 8400 switches cannot be monitored by AirWave.
- B. The 8400 switches do not support VSF.
- C. The 8400 switches have a smaller ARP table than the 540OR switches.
- D. The 8400 switches run different software than the 5400R switches.
- E. The 8400 switches are fixed port switches.
Answer: C,D
NEW QUESTION # 35
Refer to exhibit.
A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building wiring plan is shown in Exhibit i. The customer will not consider any cabling upgrades at this point. The current proposal is shown in Exhibit 2.
Which correction must the architect make to the proposal to meet the customer requirements?
- A. Change the SR transceivers tor each link between the wiring closet switches and me network core to LRM transceivers
- B. Add an aggregation layer, and connect wiring closet switches to the aggregation layer on Smart Rate pons.
- C. Add an aggregation layer, and connect wiring closet switches to the aggregation layer with SFP+- SR transceivers
- D. Add a mode conditioning cable for each link between the wiring closet switches and the network core.
Answer: D
NEW QUESTION # 36
An indoor basKetbaiI stadium has 5.000 seats in two rings:
* The stadium has a ceiling height of GO feet (18 m).
* There is a catwalk around the perimeter of the basketball court, between the court and the seating areas.
* This catwalk is 40 feet (12 m) from the floor.
* There are two scoreboards at either end of the stadium.
* The construction of the stadium is concrete and sleet.
The customer does not want an under-seat, picoceli deployment.
Which AP model is appropriate to provide coverage in the main stadium bawl?
- A. AP-555
- B. AP-575
- C. AP-577
- D. AP-505
Answer: C
NEW QUESTION # 37
A customer requires new MCs for a large multi-site network with about 600 AP-535S ana 30,000 wireless clients. The customer requires redundancy for the MCs, with each MC being able to handle the full toad in a failover situation The network should be able to sustain the loss of a controller with stateful failover within seconds. It should be able to undergo software upgrades without downtime.
The architect has recommended two 7240XM MCs. The customer points out that 7220 MCs can support their requirements and wonders why the architect recommended me 7240XMS.
What should the architect explain?
- A. The 724QXM MCs can support full CPSec tunnels with this number of APs. while the 7220 MCs cannot.
- B. The 7240XM MCs are required to support the large number of wireless clients in this network
- C. The 7240XM MCs have better redundant power supplies and fan tray component capabilities than 7220 MCs.
- D. The 7240XM MCS provide a higher number of concurrent GRE tunnels to support 600APs with MCS in L2 clustering.
Answer: B
NEW QUESTION # 38
A customer has an existing Aruba wireless solution at their campus. This solution is shown in the exhibit.
The customer now wants to enhance seamless roaming and failover across the solution. The customer wants the least expensive solution that still meets the needs.
Which figure shows the correct changes to the solution to meet the new needs?
A)
B)
C)
D)
- A. Option D
- B. Option C
- C. Option A
- D. Option B
Answer: C
NEW QUESTION # 39
A company has several remote sues that operate more or less autonomously. Each site has ns own local services and Internet connection However the company does have a main office with a few centralized resources that the company would like to make available to remote office employees over the Internet connection. Sites range in size and require between 10 and 20 APs.
The customer requires the most cost-effective solution that meets the requirements.
Which solution should the architect recommend for each remote site?
- A. Remote APs (RAPs) with IPsec tunnels to a main office MC
- B. Campus APs (CAPS) with CPSec control channels to a main office MC
- C. Campus APs (CAPs) with a local MC that has an SD-WAN license
- D. an IAP cluster with an IPsec tunnel to a main office MC
Answer: C
NEW QUESTION # 40
A retailer currently has two redundant ClearPass C2000 0L36O Gen9 hardware appliances and two perpetual 1K Access licenses. The customer uses ClearPass to authenticate employee wireless devices and other corporate wireless devices. ClearPass togs indicate that, peak license usage is currently 1900.
The customer now wants to add a guest access solution. Guests will connect to an open SSiD and be redirected to a portal which they can use to self-register and log in. The customer anticipates that up to f 550 guest devices will connect at the same time.
The customer requires the most cost-effective solution that will meet the requirements. What should the network architect recommend for this solution?
- A. 1K + 500 Access licenses; Two 1K Onboard licenses
- B. IK + 500 Access licenses: IK + 500 Guest licenses
- C. Two 1K Guest licenses
- D. 1K + 500 Access licenses
Answer: C
NEW QUESTION # 41
Refer to the exhibit.
A customer has these availability requirements;
* loss of one controller with stateful failover and without impact on wireless client connectivity
* loss of one core switch without loss of connectivity for any endpoints or APs in the building
* loss of any one switch-lo-switch or MC-to-switch link without loss of connectivity for any endpoints or APS in the building and with minimal impact on infrastructure functionality
* loss of any one access switch with minimal impact to wireless client connectivity The exhibit shows the current plan for the topology.
Which change should the architect make to the plan to provide better support for the customers availability requirements?
- A. Add 120 additional AP licenses, so that each MC can support ail the APs, even if the other MC fails.
- B. Change the 40GbE DAC on the 8400 switch to a stacking cable with stacking module.
- C. Use two 40GBE DACs between the core V3X switches for their switch links.
- D. Add VLANs 11 and 15 to the MC connections to ensure both MCS can manage any of the APS.
Answer: A
NEW QUESTION # 42
A network architect plans to propose a virtual Mobility Master (VMM) tor a new solution. The solution will support up to 4.800 wireless client devices and include:
* two Virtual Mobility controllers (VMCs) in a cluster
* 180 APs
Which licenses should the architect propose?
- A. 1 MM-VA-500; 2 MC-VA-250; 540 Enterprise licenses
- B. 1 MM-VA-IK:I MC-VA-250; 180 Enterprise licenses
- C. 1 MM-VA-1K; 2 MC-VA-25Q; one Enterprise license
- D. 1 MM-VA-500; 1 MC-VA-250; 180 Enterprise licenses
Answer: B
NEW QUESTION # 43
Refer to the exhibit.
A hotel needs a wireless solution, i he hotel has 802.3af switches.
The architect has selected the 505H Series, controlled by a local MC as the best choice The 5QoH series will need to power a connected phor which have only a single Ethernet port. The architect has created the BOM shown in the exhibit. (Note that this portion of the BOM does not inc Which correction should the architect make?
- A. Remove the mounting adapters.
- B. Upgrade to PoE+ switches.
- C. Propose new direct power source for phone.
- D. Change the 5Q5H to the 3Q3HR model.
Answer: C
NEW QUESTION # 44
Which scenario Indicates the need for a wireless mesh?
- A. A hospital needs to provide high availability for wireless services in certain areas which support very critical wireless medical devices. Devices must always be in range of at least two APs.
- B. A nsstorical building has some wired areas and a few areas with no wired or wireless connectivity, walls and ceilings have asbestos. The company needs wireless access across the site.
- C. A company has a small branch office with just one RAP. The company has noticed that performance is poor in some areas of the network and wants to add another AP.
- D. A company needs to provide seamless roaming and wireless access between two buildings. The buildings are about 60 feet (18 m) apart.
Answer: D
NEW QUESTION # 45
A network architect needs to plan quality of service (QoS) for a hospital network.
Which of these applications should receive the highest priority?
- A. MRI image transfer
- B. cloud-based scheduling software
- C. streaming IPTV in lobbies
- D. wireless voice communicator devices
Answer: B
NEW QUESTION # 46
Refer to the exhibit.
The exhibit shows the topology for a new Aruba solution. The MCs are in a ctuster and support all of the wireless traffic in the network The core switches route all traffic and support all VLANS. The access fayer switches do NOT use tunneiednode. or dynamic segmentation.
The customer has indicated that it has these VLANS for user devices.
* VLAN 11 for Floori employee wired devices
* VLAN 12 for Floor 2 employee wired devices
* VLAN 13 tor Floor 3 employee wired devices
* VLAN 14 for Floor 4 employee wired devices
* VLAN 15 for Floor 5 employee wired devices
* VLAN 101 for all employee wireless devices
* VLAN 102 for all guest wireless devices
In which locations should the architect plan the VLANs?
- A. VLANs 11-15 on one MC. VLANs 101 and 102 on the other MC. (Other VLANs will be used on the access layer switches.)
- B. VLANS 11-15 on the access layer switches on the corresponding floor; VLANS 101 and 102 on both MCS.
- C. VLANs 11-15. 101. and 102 on both MCs. (Other VLANs will be used on the access layer switches.)
- D. VLANs 11-15 on the access layer switches on the corresponding floor; VLAN 101 on one MC and VLAN 102 on me other MC
Answer: D
NEW QUESTION # 47
Refer to the exhibit.
A museum wants to add full S02.11ax wireless coverage across the building, which is about 210 feet (64 m) by 330 feet (100 m). The museum has 15-foot (4.6 m) ceilings and stone interior walls. The network needs to support up to 600 wireless guest devices The exhibit also shows a preliminary plan tor AP locations, me museum has eight Ethernet drops in the lobby and girt stop, but has otherwise not been wired.
What is one recommendation that the architect should make to ensure a successful deployment?
- A. Use at least CATS cable to connect to the APs.
- B. Add about 10 APs to achieve adequate density
- C. Use directional antennas to avoid lost signal.
- D. Add a wiring closet closer to the north side.
Answer: D
NEW QUESTION # 48
......
HP HPE6-A80 exam is intended for professionals who wish to validate their expertise in designing Aruba wireless networks. HPE6-A80 exam is part of the Aruba Certified Design Expert (ACDX) certification. Passing HPE6-A80 exam demonstrates that the candidate has the skills and knowledge required to design complex, enterprise-level wireless solutions using Aruba technologies.
2023 New Free4Torrent HPE6-A80 PDF Recently Updated Questions: https://www.free4torrent.com/HPE6-A80-braindumps-torrent.html
HP HPE6-A80 DUMPS WITH REAL EXAM QUESTIONS: https://drive.google.com/open?id=1xaCsQLnVowjwAP7sJvZVNspaX3KUwFXf