Get ready to pass the MB-320 Exam right now using our Microsoft Dynamics 365 Exam Package
A fully updated 2021 MB-320 Exam Dumps exam guide from training expert Free4Torrent
NEW QUESTION 84
A company manufactures high-end speaker systems. You have different configurations available for customers to customize features including finishes and speaker materials. You have a product configuration model with bill of material lines and conditions for each component.
A customer can optionally add on protective covers, but only if a non-metal material is selected. If any other material is selected, the covers cannot be added. You add the following attributes:
You need to create an expression-based constraint that will only allow Corner Protection if Metal is not selected.
How should you complete the expression? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 85
A company implements Dynamics 365 for Finance and Operations.
Due to increased demand and limited space in the work cell area for product L0050, you must subcontract overflow work to another company. You have the following requirements:
* Locate a supermarket at the subcontractor building.
* Support picking and shipping activity tracking.
* Associate costs of transporting materials between the locations in the cost of the finished product.
You need to modify the production flow.
A company implements Dynamics 365 for Finance and Operations.
Due to increased demand and limited space in the work cell area for product L0050, you must subcontract overflow work to another company. You have the following requirements:
* Locate a supermarket at the subcontractor building.
* Support picking and shipping activity tracking.
* Associate costs of transporting materials between the locations in the cost of the finished product.
You need to modify the production flow.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Modify the tumble polish activity and assign it to the subcontractor.
- B. Modify the tumble polish operation and associate it with the subcontractor.
- C. Create a new production flow version.
- D. Create transfer activities and assign thereto the subcontractor.
- E. Create a resource and work cell resource group for the subcontractor.
Answer: A,B,D
NEW QUESTION 86
A company produces paints and assembles bicycle frames.
You must account for paint drying time before assembly operations can begin. You need to set up the operation to encompass queue times.
Which two options can you use? Each correct answer presents part of solution.
NOTE: Each correct selection is worth one point.
- A. Build capabilities for each resource related to color
- B. Make a resource group for each size and color and assign that group to the operation
- C. Enter a value in the queue time after field for the painting operation
- D. Enter a value in the queue time before field for the assembly operation
- E. Enter a value in the transit time on the painting operation
Answer: C,D
Explanation:
Section: Set up and configure manufacturing
NEW QUESTION 87
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses batch tracking of raw materials, semi-finished goods, and finished goods.
It is difficult to determine when semi-finished and finished goods were produced and expired.
You need to incorporate automatic batch expiration dates for tracked items that are produced.
Solution:
1. Assign shelf life period in days to the items that require expiration dates.
2. Create a new reservation hierarchy that places batch at one.
3. Assign the new reservation hierarchy to the items that require expiration dates.
Does the solution meet the goal?
- A. No
- B. Yes
Answer: A
Explanation:
Explanation/Reference:
NEW QUESTION 88
A company produces multiple products that require an installation kit that includes 50 components.
The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.
You need to set up the product BOM for the finished good.
What should you do?
- A. Select Phantom on the engineering fast tab on the kit item.
- B. Change the line type to Phantom.
- C. Change the coverage group on the kit item to Manual.
- D. Change the line type to Pegged supply.
Answer: B
NEW QUESTION 89
A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished.
You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-parameters-manufac
NEW QUESTION 90
You are the product manager at a paint manufacturing company. Paint base is produced in 100 gallon batches.
The paint base can be packaged in 1 gallon, 5 gallon, and 10 gallon containers.
You want to use consolidated batch orders for the bulk paint base item. You need to set up the items and formulas to allow for consolidated batch orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 91
A company manufactures and sells speaker boxes. The speaker boxes can be silver or black with a basic or upgraded wiring harness assembly.
The speaker box must be created in the item master so that the variables for colors and harness type can be assigned at order entry.
You need to create a new item that supports multiple variables.
What should you do?
- A. Create a new product master. Select predefined variant as the configuration technology.
- B. Create a new product. Select constraint-based configuration as the configuration technology.
- C. Create a new product. Select predefined variant as the configuration technology.
- D. Create a new product master. Select constraint-based configuration as the configuration technology.
Answer: D
NEW QUESTION 92
A company that uses Lean manufacturing concepts to produce paper plates has redesigned the layout of the warehouse and production floor.
The company's production flow activities no longer match the tasks of the workers. Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 93
You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to configure the system to ensure that planned master orders generated by Material Requirements Planning (MRP) contain trade agreements.
To complete this task, sign in to Dynamics 365 portal.
Answer:
Explanation:
See explanation below.
* Navigate to the Master Planning Parameters Setup > Master Planning
Parameters).
* Select the Planned Orders
* Select the Find Trade Agreements option.
* Save the changes.
Reference:
https://docs.microsoft.com/en-us/learn/modules/configure-use-master-planning-dyn365-supply-chain-mgmt/03-p
NEW QUESTION 94
You need to create the constraint for the ML seat selection.
Which expression constraint should you use?
- A. Implies[Seat==ML,Trim==Legend]
- B. Seat!=ML
- C. [Trim==Legend|Seat==ML]
- D. Implies[Trim==Legend,Seat==ML]
Answer: A
Explanation:
Explanation/Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/expression-constraints-table-constraints- product-configuration-models
NEW QUESTION 95
A configure-to-order company is implementing Dynamics 365 for Finance and Operations. The company is preparing to use the product configuration model functionality to develop the Bill of materials (BOM), routes and valid configuration combinations.
You need to set up the configuration models, constraints, and pricing.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:

NEW QUESTION 96
A company produces various products using Process manufacturing.
The manufacturer makes two co-products from a formula and rarely produces the primary formula item. The costs of making the co-products are inflated. The manufacturer must update the costs of producing the co- products and change the formula to not produce the primary formula item.
You need to change the primary formula item type.
What should you do?
- A. Change the cost of the primary formula item to zero and then recalculate the item cost
- B. Change the production type to Bill of materials and recalculate the item cost
- C. Associate the costs to produce by-products with the items
- D. Change the primary formula item to use the planning item type
Answer: D
Explanation:
Section: Create, process, and manage production batch orders
NEW QUESTION 97
A company produces lotions for pain relief and uses Dynamics 365 for Finance and Operations.
You have been provided the following information for a new relieving lotion.
Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 98
You need to set up the correct production solution for the assembly area. Which solution should you implement?
- A. Standard warehousing for all transactions
- B. Advanced warehousing for all transactions
- C. Standard warehousing with Manufacturing execution
- D. Advanced warehousing with Manufacturing execution
Answer: D
NEW QUESTION 99
A Discrete manufacturing company produces speakers. The high-end speaker model uses protective rubber strips on the edges.
Approximately five inches of rubber is consistently scrapped in the production process, regardless of production quantity. Workers manually consume the extra material on the picking list or scrap it in an inventory journal.
You need configure the system to automatically account for this scrap on the Bill of materials (BOM).
What should you do?
- A. Set a Constant scrap of five on the BOM line for rubber.
- B. Set a Variable scrap of five percent for the rubber BOM line.
- C. Add an additional BOM line for five inches and set consumption to Variable.
- D. Increase the required quantity of the rubber component by five on the BOM.
Answer: A
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-information-used-in-bom-calculations-w
NEW QUESTION 100
......
Master 2021 Latest The Questions Microsoft Dynamics 365 and Pass MB-320 Real Exam!: https://www.free4torrent.com/MB-320-braindumps-torrent.html
Practice To MB-320 - Free4Torrent Remarkable Practice On your Microsoft Dynamics 365 Supply Chain Management, Manufacturing Exam: https://drive.google.com/open?id=1Md75PxHFvX-ZQIq_pjZCbc6DkzsASZvY