NEW QUESTION 38
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer.
Response:

  • A. Costs
  • B. Quota arrangement
  • C. Delivery date
  • D. Component availability
  • E. Vendor rating

Answer: B

 

NEW QUESTION 39
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:

  • A. Assigning a production scheduling profile
  • B. Setting a planning time fence in the Material Master Record
  • C. Creating a planned order within the planning time fence
  • D. Manually changing the quantity of a planned order

Answer: B,C

 

NEW QUESTION 40
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:

  • A. Minimum lot sizing
  • B. Fixed lot sizing
  • C. Exact lot sizing
  • D. Periodic lot sizing

Answer: D

 

NEW QUESTION 41
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

  • A. When the MRP results are saved
  • B. When you create a sales order
  • C. When you create a planned order
  • D. When you deliver a sales order

Answer: B

 

NEW QUESTION 42
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:

  • A. Purchase orders
  • B. Collective orders
  • C. Stock transfers
  • D. Transfers from batch to batch
  • E. Planned orders

Answer: A,C,D

 

NEW QUESTION 43
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Run PP/DS heuristics for repetitive manufacturing.
  • B. Run MRP with quota arrangement.
  • C. Run MRP with automatic selection of production version.
  • D. Assign planned orders manual lying the planning table.

Answer: A,B

 

NEW QUESTION 44
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.

  • A. Add the agreement to the source list and mark it for MRP relevance.
  • B. Add the agreement to the quota arrangement and mark it for MRP relevance.
  • C. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • D. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

Answer: A,C

 

NEW QUESTION 45
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products?
Please choose the correct answer.
Response:

  • A. By creating routings with alternative sequences
  • B. By assigning different materials to the same routing
  • C. By assigning the same production version to different materials
  • D. By creating routings with parallel sequences

Answer: B

 

NEW QUESTION 46
What is SAP's strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer.
Response:

  • A. PP Standard Sales and Operations Planning
  • B. APO Demand Planning
  • C. Flexible Planning
  • D. Integrated Business Planning

Answer: D

 

NEW QUESTION 47
Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:

  • A. Enter time-ticket confirmation for production orders
  • B. Change planned order quantities
  • C. Undo for drag & Drop planning activities
  • D. Change sales order quantities

Answer: B,C

 

NEW QUESTION 48
What does the industry sector determine? Note: There are 2 correct answers to this question.

  • A. Whether a material master field is required, changeable, displayed, or hidden
  • B. Which material master views can be maintained
  • C. Whether material numbers are assigned internally or externally
  • D. Which transaction you can use to create a new material

Answer: A,B

 

NEW QUESTION 49
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

  • A. The planning strategy is infinite.
  • B. The work center has several individual capacities.
  • C. The Change Planning Direct on indicator is set.
  • D. Alternative resources are fully occupied.

Answer: A,B

 

NEW QUESTION 50
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?

  • A. Supply Network Planning (SNP)
  • B. Capacity Requirements Planning (CRP)
  • C. Material Requirements Planning (MRP)
  • D. Demand Planning (DP)

Answer: C

 

NEW QUESTION 51
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  • A. Top of Red
  • B. Top of Yellow
  • C. Top of Red Base
  • D. Top of Green

Answer: D

 

NEW QUESTION 52
What does the bill of material usage (BOM usage) control at the BOM item level?
Response:

  • A. Default values for the item status
  • B. Allowed material type
  • C. Maximum allowed low-level code
  • D. Default unit of measure

Answer: B

 

NEW QUESTION 53
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Order (pool) chart
  • C. Capacity requirements chart
  • D. Orders (dispatched) chart

Answer: A,C

 

NEW QUESTION 54
Which of these are layers in SAP Best Practice content?
There are 3 correct answers to this question.
Response:

  • A. Configuration guides
  • B. Process diagrams
  • C. Building blocks
  • D. Scope items
  • E. Solution packages

Answer: C,D,E

 