
[Nov 17, 2021] Valid E-S4HCON2022 Test Answers & E-S4HCON2022 Exam PDF
Valid SAP Certified Technology Specialist E-S4HCON2022 Dumps Ensure Your Passing
NEW QUESTION 15
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
- A. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
- B. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
- C. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
- D. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
Answer: B
NEW QUESTION 16
ICNV initialization does 3
- A. Creation of views
- B. Creation of flag
- C. AA
- D. Build index on flag column
Answer: A,B,D
NEW QUESTION 17
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
- A. Using DMO when applying Support Packages to SAP ECC 6.07
- B. SAP S/4HANA conversion to SAP S/4HANA 1709
- C. Upgrading to SAP ECC 6.08 without using DMO
- D. Updating to SAP ECC 6.07 using DMO
Answer: B,C
NEW QUESTION 18
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
- A. AA
- B. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
Answer: B
NEW QUESTION 19
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:
- A. Specify the business functions that need to be switched on during the prepare part of SUM.
- B. Import a transport request from the development system that contains the recording of the activation.
- C. Activate the required business functions manually in the production system.
- D. During conversion, SUM delivers some business functions already activated.
Answer: B,D
NEW QUESTION 20
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:
- A. An additional temporary database is used during uptime
- B. TABIMJJPG is executed in uptime
- C. Dedicated application tables are migrated in uptime
- D. The repository is migrated in uptime
Answer: C
NEW QUESTION 21
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
- A. Import of dictionary objects from the download directory in phase DDIC_UPG
- B. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
- C. Activation of dictionary objects in phase ACT_UPG
- D. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
- E. Import of upgrade and language data from the download directory in phase TABIM UPG
Answer: A,C,E
NEW QUESTION 22
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:
- A. By searching for transport requests named <SID>K0<number>
- B. By searching for transport requests in DIR_TRANS, subdirectory "transport"
- C. By searching for transport requests in the file umodauto.Ist
- D. By searching for transport requests that are assigned to the project SAP_ADJUST
Answer: C
NEW QUESTION 23
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
- A. Parameter file SAPup_add.par
- B. Breakpoint configuration file SAPUPPHAS.BRK
- C. Stack XML file calculated by the Maintenance Planner
- D. MIGRATE J5T_DUR_XML file from a previous run
Answer: C,D
NEW QUESTION 24
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
- A. AA
- B. An SAP S4HANA 1709 sandbox system
- C. A Standalone SAP system with ABAP 7.51 or above
Answer: B,C
NEW QUESTION 25
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
- A. SUM without DMO
- B. SUM with DMO
- C. SWPM using the Load procedure
- D. SWPM using the Backup / Restore procedure
Answer: C
NEW QUESTION 26
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
- A. It is target release specific
- B. It contains a troubleshooting section
- C. It is a database-specific document
- D. It contains a section "free space requirements"
Answer: A,D
NEW QUESTION 27
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:
- A. Choose the instance number of the shadow instance.
- B. Keep archiving on during the whole procedure.
- C. Reuse a profile for the shadow instance from a previous run.
- D. Use the Near Zero Downtime Maintenance Technology (NZDM).
Answer: A,C
NEW QUESTION 28
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.
- A. The target database size increases temporarily because of the Shadow Repository.
- B. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
- C. SAP HANA Landscape Reorganization required a manual step to edit a file.
- D. The source system is non-Unicode and the target database is a scale-out system.
- E. Network capacity between exporting and importing R3load processes must be.
Answer: B,C
NEW QUESTION 29
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- B. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
- C. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
- D. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
Answer: A
NEW QUESTION 30
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
- A. The path was stored in file host_profile during registration
- B. The path was stored to the environment of user <sid>adm during registration
- C. The path was stored in file sumabap conf during registration
- D. The path is taken from the URL entered in the browser to start SUM
Answer: C
NEW QUESTION 31
In ICNV. How database operations synchronized between the source and the target table?
- A. AA
- B. Deletes are directly executed in the target table by delete trigger.
Answer: B
NEW QUESTION 32
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
- B. Before continuing with the next phase SUM asks for a modification adjustment transport
- C. SUM continues with the next phase and your modifications are lost
- D. SUM continues with the next phase and your modifications are kept as In the start release
Answer: D
NEW QUESTION 33
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:
- A. Extract the SAP HANA client installation archive
- B. Move the SAPM update archive into the download folder
- C. Move the stack.xml update file into the download folder
- D. Extract the SAP HANA database installation archive
- E. Move the R3trans update archive into the download folder
Answer: A,B,C
NEW QUESTION 34
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
- A. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- B. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
- C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
- D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
Answer: B
NEW QUESTION 35
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correct answers to this question.
Response:
- A. Check the log files written under "SUM\abap\log"
- B. Check the "Charts Control Center" in the SUM UI
- C. Check logs for jobs starting with "RSUPG_SGEN" in the system
- D. Check the dump size of the database export on disk
Answer: A,B
NEW QUESTION 36
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. Target DB size will increase temporarily
- B. DMO can only be run with systems NW740 or NW731
- C. A
Answer: A,B
NEW QUESTION 37
......
SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Details:
| Reference Books | ADM328, ADM328 (SAP S/4HANA 2020) |
| Passing Score | E_S4HCON2022 - 65% E_S4HCON2020 - 68% |
| Duration | 90 mins |
| Exam Price | $550 (USD) |
| Number of Questions | 40 |
| Exam Code | E_S4HCON2022 |
| Exam Name | SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade |
| Sample Questions | SAP S/4HANA Conversion and SAP System Upgrade Certification Sample Questions |
| Level | Associate |
| Schedule Exam | SAP Training |
SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Handling of an SAP System Landscape | Describe the handling of the SAP system landscape during SAP S/4HANA conversion and SAP system upgrade ADM328 | 8% - 12% |
| Downtime | Describe the factors influencing downtime and techniques to reduce downtime ADM328 | 8% - 12% |
| SUM Monitoring and Troubleshooting | Monitor and troubleshoot the SUM procedure ADM328 | 8% - 12% |
| Manual Activities for SUM | Describe the necessary manual preparation and follow-on activities for SUM ADM328 | 8% - 12% |
| SAP S/4HANA Conversion Prepare Phase | Describe and perform the actions necessary during the SAP S/4HANA conversion prepare phase ADM328 | > 12% |
| Modification Adjustment | Perform the modification adjustment with SPDD and SPAU ADM328 | 8% - 12% |
| SUM Execution Part | Perform the SUM execution part, including DMO ADM328 | > 12% |
| SUM Prepare Part | Perform the SUM prepare part ADM328 | > 12% |
E-S4HCON2022 Dumps Real Exam Questions Test Engine Dumps Training: https://www.free4torrent.com/E-S4HCON2022-braindumps-torrent.html
E-S4HCON2022 exam dumps and online Test Engine: https://drive.google.com/open?id=1kri-oJL4mgxzLaFnkErnLybM0_RtSZ74