[Nov-2021] Valid Way To Pass SAP Exam Dumps with E_S4HCON2020 Exam Study Guide [Q21-Q44]

Share

[Nov-2021] Valid Way To Pass SAP Exam Dumps with E_S4HCON2020 Exam Study Guide

All E_S4HCON2020 Dumps and SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Training Courses Help candidates to study and pass the Exams hassle-free!

NEW QUESTION 21
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests that are assigned to the project SAP_ADJUST
  • B. By searching for transport requests in the file umodauto.Ist
  • C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • D. By searching for transport requests named <SID>K0<number>

Answer: C

 

NEW QUESTION 22
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.

  • A. Import of upgrade and language data from the download directory in phase TABIM UPG
  • B. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • C. Activation of dictionary objects in phase ACT_UPG
  • D. Import of dictionary objects from the download directory in phase DDIC_UPG
  • E. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE

Answer: A,C,D

 

NEW QUESTION 23
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Linux, SAP HANA
  • B. Kernel for source release, Windows, SAP MaxDB
  • C. Kernel for target release, Windows, SAP HANA
  • D. Kernel for target release, Windows, SAP MaxDB

Answer: B,C

 

NEW QUESTION 24
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

  • A. Configure it within transaction ATC
  • B. Apply the corresponding SAP note via SAP Note Assistant
  • C. Download it from SAP Support Portal
  • D. Generate it by analyzing the specific custom code via RFC

Answer: C

 

NEW QUESTION 25
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:

  • A. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
  • B. You can find the optimal number of parallel R31oad processes by monitoring host performance.
  • C. You can verify that the content of the download directory matches the stack.XML file.
  • D. You can record the modification adjustment during migration and use the transports in the next runs.

Answer: A,B

 

NEW QUESTION 26
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Specify the business functions that need to be switched on during the prepare part of SUM.
  • B. During conversion, SUM delivers some business functions already activated.
  • C. Activate the required business functions manually in the production system.
  • D. Import a transport request from the development system that contains the recording of the activation.

Answer: B,D

 

NEW QUESTION 27
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
  • B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • C. You need to build up a SI check framework by applying SAP notes.
  • D. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.

Answer: A,C

 

NEW QUESTION 28
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SWPM using the Load procedure
  • B. SWPM using the Backup / Restore procedure
  • C. SUM with DMO
  • D. SUM without DMO

Answer: A

 

NEW QUESTION 29
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Check the compatibility of custom code with SAP S/4HANA
  • B. Apply the recommendations of the simplification list
  • C. Run the database migration to the SAP HANA database
  • D. Perform the migration of data into the new data structure

Answer: A,B

 

NEW QUESTION 30
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

  • A. Stack XML file calculated by the Maintenance Planner
  • B. Breakpoint configuration file SAPUPPHAS.BRK
  • C. Parameter file SAPup_add.par
  • D. MIGRATE_DT_DUR_XML file from a previous run

Answer: A,D

 

NEW QUESTION 31
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:

  • A. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
  • B. SUM is still running in uptime; the number of 40 defined R3load processes is considered.
  • C. The number of CPU cores does not allow more than 40 R3load processes to be run in parallel.
  • D. There is a maximum of 40 parallel R3load processes within this specific downtime phase.

Answer: A

 

NEW QUESTION 32
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:

  • A. Phase RUN_RSDBSCPY
  • B. Phases EU_IMPORT*
  • C. Phases DIFF*
  • D. Phase DOWNCONF_DTTRANS
  • E. Phase RUN_RSPTBFIL _ISUTABU

Answer: B,C,D

 

NEW QUESTION 33
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. An additional temporary database is used during uptime
  • B. Dedicated application tables are migrated in uptime
  • C. TABIM_UPG is executed in uptime
  • D. The repository is migrated in uptime

Answer: B

 

NEW QUESTION 34
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • B. Combine the upgrade and the Unicode conversion using the Combined Upgrade & Unicode Conversion (CU & UC) procedure.
  • C. Combine the upgrade and the Unicode conversion using the Twin Upgrade & Unicode Conversion (TU
    & UC) procedure.
  • D. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

Answer: A

 

NEW QUESTION 35

  • A. Kernel for target release, Linux, SAP HANA
  • B. Kernel for source release, Windows, SAP MaxDB
  • C. Kernel for target release, Windows, SAP HANA
  • D. You are performing the corresponding maintenance transaction with the Maintenance Planner.
    Which kernels do you need to select for the SAP S/4HANA conversion?
    There are 2 correct answers to this question.
    Response:
  • E. Kernel for target release, Windows, SAP MaxDB

Answer: B,C

 

NEW QUESTION 36
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
  • B. The SAP Support Packages that will be bound to the upgrade
  • C. The SAP Support Packages contained in the upgrade media
  • D. The SAP Support Packages found in the download directory

Answer: D

 

NEW QUESTION 37
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
  • B. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
  • C. The upgrade of the PRD must be finished before you start new development in the DEV.
  • D. The transport between Unicode and non-Unicode systems is forbidden.

Answer: B

 

NEW QUESTION 38
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. AA
  • B. The link to different patch levels to SUM
  • C. An overview about possible upgrade paths
  • D. The corrections to the SUM Guide

Answer: B,C,D

 

NEW QUESTION 39
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests that are assigned to the project SAP_ADJUST
  • B. By searching for transport requests named <SID>K0<number>
  • C. By searching for transport requests in the file umodauto.Ist
  • D. By searching for transport requests in DIR_TRANS, subdirectory "transport"

Answer: C

 

NEW QUESTION 40
In ICNV. How database operations synchronized between the source and the target table?

  • A. Deletes are directly executed in the target table by delete trigger.
  • B. AA

Answer: A

 

NEW QUESTION 41
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.

  • A. By searching for transport requests that are assigned to the project SAP_ADJUST
  • B. By searching for transport requests named <SID>K0<number>
  • C. By searching for transport requests in the file umodauto.Ist
  • D. By searching for transport requests in DIR_TRANS, subdirectory "transport"

Answer: C

 

NEW QUESTION 42
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:

  • A. Choose the instance number of the shadow instance.
  • B. Keep archiving on during the whole procedure.
  • C. Use the Near Zero Downtime Maintenance Technology (NZDM).
  • D. Reuse a profile for the shadow instance from a previous run.

Answer: A,D

 

NEW QUESTION 43
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. Before the downtime starts
  • B. Early in the downtime
  • C. As part of the cleanup process
  • D. At the end of the downtime

Answer: A

 

NEW QUESTION 44
......

Get Latest [Nov-2021] Conduct effective penetration tests using  Free4Torrent E_S4HCON2020: https://www.free4torrent.com/E_S4HCON2020-braindumps-torrent.html