
SAP Certified Application Associate C-TSCM42-67 Dumps | Updated Nov 01, 2021 - Free4Torrent
Master 2021 Latest The Questions SAP Certified Application Associate and Pass C-TSCM42-67 Real Exam!
SAP C-TSCM42-67 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Material and Capacity Requirements Planning > 12% | Characterize production-relevant planning functionality. |
| Lean Manufacturing (PP-REM, PP-KAB) 8% - 12% | Outline the highlights of repetitive manufacturing and kanban. |
| Material Requirements Planning (PP-MRP) > 12% | Explore material requirements planning functions. |
| Production Orders Basics (PP-SFC) 8% - 12% | Apply production order functionality. |
| Application Overview and Background < 8% | Characterize the interplay of master data, planning, ATP, and production functionality. |
| Process Orders (PP-PI) < 8% | Identify specific properties of process orders. |
| Basics on SAP Business Processes (E-Learnings) < 8% | Outline the scope of SAP SCM business processes. |
| Master Data (LDM) 8% - 12% | Set up master data for production planning and manufacturing. |
| Production Orders Advanced (PP-SFC) > 12% | Configure production order functionality. |
NEW QUESTION 36
Which of the following requirements is supported by using process orders?
- A. Linkage of documents to orders
- B. Documentation of the production using an electronic batch record
- C. Use of production/resource tools
- D. Use of reference operation sets
Answer: B
NEW QUESTION 37
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:
- Start: 7:00:00 a.m.
- End: 3:00:00 p.m.
- Break duration: 1 hour
- Rate of utilization: 80%
- Overload: 110%
- Number of individual capacities: 1
How large is the standard available capacity?
- A. 8 hours
- B. 5.6 hours
- C. 7 hours
- D. 6.16 hours
Answer: B
NEW QUESTION 38
Which of the following are properties of ECC Multi-Site Planning? (Choose two.)
- A. The use of scope of planning (cross-plant total planning) is mandatory for Multi-Site Planning.
- B. When using two-step stock transport order with delivery, the receiving plant is defined as a customer.
- C. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
- D. Both withdrawal from alternative plant and withdrawal from another plant are defined via special procurement keys.
Answer: B,D
NEW QUESTION 39
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
- A. A storage location may be assigned to different MRP areas.
- B. Make-to-order production is supported by storage location MRP areas.
- C. Subcontracting is supported by MRP areas.
- D. An MRP area may include different storage locations.
Answer: C,D
NEW QUESTION 40
In which of the following objects can you activate back flushing for production orders? (Choose three)
- A. Routing
- B. Material master (component)
- C. Production scheduling profile
- D. Work center
- E. Material master (finished product)
Answer: A,B,D
NEW QUESTION 41
Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three)
- A. Lot size optimization
- B. Midpoint scheduling
- C. Setup time reduction
- D. Batch size optimization
- E. Finite capacity scheduling
Answer: B,C,E
NEW QUESTION 42
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)
- A. Work center
- B. Material master
- C. Task list
- D. Production version
- E. Bill of material
Answer: B,C,E
NEW QUESTION 43
In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?
- A. In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times.
- B. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
- C. Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.
- D. Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing.
Answer: A
NEW QUESTION 44
Which property applies for consumption with planning strategy 40 (planning with final assembly)?
- A. Consumption can result in subsequent adjustments of planned receipts.
- B. Consumption can reduce the originally planned production quantity.
- C. Consumption takes place with the planning material.
- D. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
Answer: A
NEW QUESTION 45
You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills of material for various final products- must not be sold directly Which standard SAP material type do you use?
- A. NLAG (non-stock material)
- B. HAWA (trading good)
- C. FERT (finished product)
- D. ROH (raw material)
Answer: D
NEW QUESTION 46
Which Customizing element controls the determination of planned costs in production orders?
- A. Settlement profile
- B. Costing variant
- C. Accounting type
- D. Calculation procedure
Answer: B
NEW QUESTION 47
Which function is supported by production orders?
- A. Automatic selection of a work center at order release
- B. Automatic reading of PP master data at order release
- C. Automatic creation of transfer orders at order release
- D. Automatic printing of order documents at order creation
Answer: C
NEW QUESTION 48
From what point can you no longer use the Read PP master data in the production order?
- A. After assigning the confirmed quantity of a material component due to carrying out a material availability check.
- B. After the first posting of goods movements or confirmation.
- C. After printing the order papers.
- D. From the release of the production order.
Answer: B
NEW QUESTION 49
What do you have to consider regarding consumption? (Choose two)
- A. Consumption is restructured with the planning run.
- B. Consumption takes place on the material level between the planned independent requirements and the planned orders.
- C. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
- D. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
Answer: C,D
NEW QUESTION 50
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
- A. Total planning online
- B. Multi-level single-item planning with the "simulation mode" option
- C. Multi-level single-item planning with the "display material list" option
- D. Interactive single-item planning for the delayed assembly
Answer: B
NEW QUESTION 51
Which of the following scheduling types can only be used in capacity planning?
- A. Forward
- B. Midpoint
- C. Only capacity requirements
- D. Backward
Answer: B
NEW QUESTION 52
Which statements are true for ECC Long-Term Planning (LTP)? (Choose two.)
- A. In case of external procurement, long-term planning creates purchase requisitions.
- B. A planning scenario must be released to use it in long-term planning.
- C. Long-term planning generally is operational planning of important components.
- D. Reorder point planned materials can be included in long-term planning.
Answer: B,D
NEW QUESTION 53
You want to enhance the system statuses of a production order with user statuses.
How do you do this?
- A. Define the user statuses in the Customizing table of the system statuses.
- B. Define a status profile in Customizing and assign it to the production scheduling profile.
- C. Define the user statuses in the order type-dependent parameters.
- D. Define a status profile in Customizing and assign it to the order type.
Answer: D
NEW QUESTION 54
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)
- A. LTP focuses on the operational planning of important components.
- B. LTP creates purchase requisitions for external procurement.
- C. A planning scenario must be released before it can be used in LTP.
- D. Reorder point planned materials can be included in LTP.
Answer: C,D
NEW QUESTION 55
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?
- A. Substitute sequence
- B. Parallel sequence
- C. Alternative sequence
- D. Standard sequence
Answer: C
NEW QUESTION 56
......
A fully updated 2021 C-TSCM42-67 Exam Dumps exam guide from training expert Free4Torrent: https://www.free4torrent.com/C-TSCM42-67-braindumps-torrent.html