[Sep 24, 2022] Latest Questions C-TS422-2021 Guide to Prepare Free Practice Tests [Q15-Q31]

Share

[Sep 24, 2022] Latest Questions C-TS422-2021 Guide to Prepare Free Practice Tests

Reliable C-TS422-2021 Dumps Questions Available as Web-Based Practice Test Engine


SAP C-TS422-2021 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Determine BOM item category, describe order status management and set user statuses
  • Material Requirements Planning in SAP S
  • 4HANA
Topic 2
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Capacity Planning in SAP S
  • 4HANA
Topic 3
  • Explain planning evaluation concepts
  • SAP User Experience strategy
Topic 4
  • Characterize process order elements and process order processing
  • Outline the basics and master data of advanced planning
Topic 5
  • Set up an order type, apply material staging and confirmation
  • Explain line load planning and confirmation
Topic 6
  • Explain and compare the different production methods in make-to-order
  • Outline production planning components and functions
Topic 7
  • Identify and explain production relevant master data
  • Configure availability check for components
Topic 8
  • Determine master data objects for process orders
  • Introduction to SAP S
  • 4HANA Supply Chain Planning
Topic 9
  • Identify repetitive manufacturing specific master data
  • Identify features for Good Manufacturing Practices (GMP)


SAP C-TS422-2021 Exam Description:

The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.

 

NEW QUESTION 15
When can the automatic material availability check occur in a production order?

  • A. At order settlement
  • B. At order creation
  • C. At order confirmation
  • D. At order release

Answer: B,D

 

NEW QUESTION 16
During production order creation, several valid production versions are found. How does the system choose the production version?

  • A. Planned order or material number
  • B. Lot size or material cost
  • C. Valid period or sale order
  • D. Alphanumeric or quota arrangement

Answer: D

 

NEW QUESTION 17
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Planning without final assembly (50)
  • B. Planning with final assembly (40)
  • C. Planning at assembly level (70)
  • D. Make-to-order production (20)

Answer: A

 

NEW QUESTION 18
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • B. MRP creates capacity requirements only if the work center has sufficient capacity.
  • C. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • D. MRP creates capacity requirements without checking the capacity of a work center.

Answer: D

 

NEW QUESTION 19
Why would you use phantom assemblies?

  • A. To make the assignment of components easier
  • B. To simplify the structure of bills of materials
  • C. To reduce the number of changes required in bills of materials
  • D. To increase the number of planning levels
  • E. To reduce the number of material masters

Answer: A,B,C

 

NEW QUESTION 20
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Variable-size item
  • B. WBS item
  • C. Work item
  • D. Non-stock item

Answer: A,D

 

NEW QUESTION 21
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

  • A. Assign the alert profile to the overall profile.
  • B. Create object selection variant for transportation lane-related alerts.
  • C. Create object selection variant for product-related alerts.
  • D. Assign the overall profile to the authorization profile.

Answer: A,C

 

NEW QUESTION 22
Which of the following elements does MRP take into account during net requirement calculation?

  • A. Purchase orders
  • B. Maximum stock level
  • C. Lot size
  • D. Safety stock

Answer: C,D

 

NEW QUESTION 23
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple production versions are maintained for one product
  • B. When multiple planned orders exist on one resource
  • C. When alternate resources are used within one operation
  • D. When multiple operations are maintained for one product

Answer: C

 

NEW QUESTION 24
Which mhetods are available for goods issue posting of material components for process orders?

  • A. Picking list
  • B. Transfer order
  • C. Kanban
  • D. Blackflushing

Answer: A,D

 

NEW QUESTION 25
How can you carry out cost object controlling for production orders?

  • A. Milestone-related
  • B. Order-related
  • C. Product-related
  • D. Cost-related

Answer: B,C

 

NEW QUESTION 26
For which categories can you define BOMs in SAP S/4HANA?

  • A. Class
  • B. Document Structure
  • C. Work Center
  • D. Sales order

Answer: B,D

 

NEW QUESTION 27
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)

  • A. Use a propagation range.
  • B. Use a planning group.
  • C. Use heuristic.
  • D. Use a resource group.

Answer: C

 

NEW QUESTION 28
What does the material type influence?

  • A. Which material master views can be maintained
  • B. Which document types are allowed
  • C. Whether the material is produced in-house, procured externally or bouth
  • D. Which plant specific status is allowed

Answer: A,C

 

NEW QUESTION 29
For a production version to be valid and consistent what requirements must be fulfilled?

  • A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • B. The assigned routing must NOT have alternative sequences.
  • C. The lot size range must be within the lot-size range of the assigned routing.
  • D. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • E. The assigned routing must be a rate routing.

Answer: A,C,D

 

NEW QUESTION 30
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Setup matrix
  • B. Operation network
  • C. Resource network
  • D. Work center hierarchy

Answer: D

 

NEW QUESTION 31
......

Correct and Up-to-date SAP C-TS422-2021 BrainDumps: https://www.free4torrent.com/C-TS422-2021-braindumps-torrent.html

Current C-TS422-2021 dumps Preparation through Our Practice Test: https://drive.google.com/open?id=1SCuEnWNxP9eXnOLd_ocVp7BMlaoOAzGJ