SAP C-TS422-2021 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
SAP C-TS422-2021 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and inādepth technical skills to participate as a member of a project team in a mentored role.
NEW QUESTION 15
When can the automatic material availability check occur in a production order?
- A. At order settlement
- B. At order creation
- C. At order confirmation
- D. At order release
Answer: B,D
NEW QUESTION 16
During production order creation, several valid production versions are found. How does the system choose the production version?
- A. Planned order or material number
- B. Lot size or material cost
- C. Valid period or sale order
- D. Alphanumeric or quota arrangement
Answer: D
NEW QUESTION 17
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Planning without final assembly (50)
- B. Planning with final assembly (40)
- C. Planning at assembly level (70)
- D. Make-to-order production (20)
Answer: A
NEW QUESTION 18
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- B. MRP creates capacity requirements only if the work center has sufficient capacity.
- C. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- D. MRP creates capacity requirements without checking the capacity of a work center.
Answer: D
NEW QUESTION 19
Why would you use phantom assemblies?
- A. To make the assignment of components easier
- B. To simplify the structure of bills of materials
- C. To reduce the number of changes required in bills of materials
- D. To increase the number of planning levels
- E. To reduce the number of material masters
Answer: A,B,C
NEW QUESTION 20
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Variable-size item
- B. WBS item
- C. Work item
- D. Non-stock item
Answer: A,D
NEW QUESTION 21
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?
- A. Assign the alert profile to the overall profile.
- B. Create object selection variant for transportation lane-related alerts.
- C. Create object selection variant for product-related alerts.
- D. Assign the overall profile to the authorization profile.
Answer: A,C
NEW QUESTION 22
Which of the following elements does MRP take into account during net requirement calculation?
- A. Purchase orders
- B. Maximum stock level
- C. Lot size
- D. Safety stock
Answer: C,D
NEW QUESTION 23
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When multiple production versions are maintained for one product
- B. When multiple planned orders exist on one resource
- C. When alternate resources are used within one operation
- D. When multiple operations are maintained for one product
Answer: C
NEW QUESTION 24
Which mhetods are available for goods issue posting of material components for process orders?
- A. Picking list
- B. Transfer order
- C. Kanban
- D. Blackflushing
Answer: A,D
NEW QUESTION 25
How can you carry out cost object controlling for production orders?
- A. Milestone-related
- B. Order-related
- C. Product-related
- D. Cost-related
Answer: B,C
NEW QUESTION 26
For which categories can you define BOMs in SAP S/4HANA?
- A. Class
- B. Document Structure
- C. Work Center
- D. Sales order
Answer: B,D
NEW QUESTION 27
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)
- A. Use a propagation range.
- B. Use a planning group.
- C. Use heuristic.
- D. Use a resource group.
Answer: C
NEW QUESTION 28
What does the material type influence?
- A. Which material master views can be maintained
- B. Which document types are allowed
- C. Whether the material is produced in-house, procured externally or bouth
- D. Which plant specific status is allowed
Answer: A,C
NEW QUESTION 29
For a production version to be valid and consistent what requirements must be fulfilled?
- A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- B. The assigned routing must NOT have alternative sequences.
- C. The lot size range must be within the lot-size range of the assigned routing.
- D. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- E. The assigned routing must be a rate routing.
Answer: A,C,D
NEW QUESTION 30
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Setup matrix
- B. Operation network
- C. Resource network
- D. Work center hierarchy
Answer: D
NEW QUESTION 31
......